The Singapore National Stadium, completed in 2014, is located in a centric plot of the city of Singapore. The building has been thought following a double perspective, since it is designed for both its daily sports use and for sporting events that require a large capacity. Likewise, the impact of the stadium in the city is given the same value as the individual scale, being the spectator’s comfort a particularly important issue.

The impressive sports stadium, designed by Arup Associates, is covered by a dome that holds the record of the largest free-span dome, since 310 meters run between the structural supports of the room. Among the implemented innovative structural solutions that allow maximum versatility of space we can find retractable tiers, a mobile cover... Everything that is needed to make the National Stadium of Singapore a global benchmark for the future design of large stadiums.
 

Description of the project by ARUP Associates

Located on a stunning, central, 35 hectare waterfront site, the Singapore Sports Hub provides a unique ecosystem of sporting, retail and leisure spaces, at the pivot between Singapore’s expanding city centre and the wider public community.

.- 55,000-seat National Stadium with movable roof, ultra-thin dome roof structure. 
.- The world’s largest free-span dome, spanning 310 meters. 
.-Innovative moving tier design to accommodate a wide range of sporting and cultural events for year-round activity. 
.- Energy-efficient spectator cooling system designed for Singapore’s tropical climate. 
.- The largest sports infrastructure Public Private Partnership project in the world.

At the heart of Sports Hub is the new Singapore National Stadium, a state-of-the-art 55,000 seat sports venue.  The innovative design, led byarchitects and engineers from Arup, is a model for future sustainable stadium design. The stadium is air-cooled for comfort and designed with a movable roof and retractable seating to support the widest range of sports and leisure events throughout the year.

Adjacent to the stadium are community, recreational and retail spaces, all conceived as an integral part of the wider masterplan, by Arup, DP Architects & AECOM. Landscaping is an essential component of the public realm, its design and planning resonating with Singapore’s identity as a Garden City.

Design versatility
Versatility is central to the stadium design and is a key factor in the stadium’s high footfall. By integrating moving tiers, palletised turf modules and a fully closing roof, this is the first stadium in the world custom designed to host athletics, football, rugby and cricket all in one venue. It also hosts major international concerts, shows and festivals with the dramatic skyline of the city of Singapore as a backdrop.

An engineering feat
The National Stadium roof, at 310 meters, is the world’s largest free-span dome.  The moveable roof provides shade and cooling when required and of course shelter from rainfall. The roof is left open when the Stadium is not in use, keeping the grass pitch in healthy condition. The moveable section of the roof incorporates a matrix of LED lighting and, at 20,000 square meters, it is one of the largest LED displays in the world.

Comfort in the tropics
The National Stadium is a model for tropical climate design. It features an innovative energy-efficient spectator cooling system that delivers cooled air to every seat in the stadium. These pockets of cooled air will reduce energy use significantly, compared to a more conventional overhead cooling system. The ultra-thin dome roof structure with a movable roof that extends over the pitch provides shade during events.

Total Architecture 
Arup has a long-standing track record of bringing the best of its international expertise to large projects around the world – and there is no better story to tell than its role in delivering the design of the Singapore Sports Hub.

A key tenet of design at Arup is the concept of ‘total architecture’ or holistic design from city scale to spectator. This philosophy was exemplified in the way design teams were organised to foster collective thinking in the development of Singapore Sports Hub.

Innovative ideas were nurtured and delivered, to make the Sports Hub a venue perfectly matched to its location. It meets all its objectives: providing a day-to-day recreational sporting environment for all of the city’s residents, and a unique, sustainable and spectacular setting for international sporting fixtures and world-class concerts.  A magnificent sporting and event facility, the Sports Hub will serve Singapore well for many decades to come.

Read more
Read less

More information

Label
Design
Text
ARUP Associates
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Engineering
Text
ARUP Group
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Team
Text
ARUP ASSOCIATES + ARUP + DP ARCHITECTS + AECOM
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Completion
Text
Summer of 2014
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Location
Text
Singapore, Singapore
+ + copy Created with Sketch.
- + copy Created with Sketch.
Jo Wright joined Arup Associates as Practice Leader in 2015. In her previous role as a Partner in the renowned Feilden Clegg Bradley Studios, she led design teams for a variety of award winning and innovative projects, in the UK and overseas, winning 10 National RIBA Awards, Sustainability Awards from the RIBA and the Civic Trust and the first ever BCO Innovations Award. She was responsible for leading the design of many of FCBS’s most well-known buildings including their first BREEAM Outstanding building, the Hive in Worcester.
Read more
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...