The project, designed by Frank Gehry, is part of process transformation, by the architect, for Downtown Los Angeles landscape beginning with his iconic Walt Disney Concert Hall and continuing with his latest, adjacent mixed-use addition called "The Grand". Gehry has been working together with habitual collaborators Michael Ferguson and Yasuhisa Toyota of Nagata Acoustics and TheaterDNA respectively.
The centerpiece of the new complex has the 1,000-seat Terri and Jerry Kohl Concert Hall that features a Vineyard Style seating arrangement with an orchestra pit and sizable stage framed brilliantly by the suspension cloud-like acoustical ceiling panels which appear to float on this spectacular room.
Next to the larger concert venue is a smaller, 100-seat theater that sits on top of a two-story volume showing four dance studios, with a transparent glass enveloping, that provides the passersby with an up-close look inside and its activities of dance.
Each artistic space will tie together with two different gardens on the roof of the dance theater and alternatively face 2nd Street at ground level with space in both for events.
The entire complex is located across from the existing facilities on a slope connecting Olive to Hill Street. Break ground is slated to begin next year, with an anticipated completion date set for the fall of 2025.
The centerpiece of the new complex has the 1,000-seat Terri and Jerry Kohl Concert Hall that features a Vineyard Style seating arrangement with an orchestra pit and sizable stage framed brilliantly by the suspension cloud-like acoustical ceiling panels which appear to float on this spectacular room.
Next to the larger concert venue is a smaller, 100-seat theater that sits on top of a two-story volume showing four dance studios, with a transparent glass enveloping, that provides the passersby with an up-close look inside and its activities of dance.
Each artistic space will tie together with two different gardens on the roof of the dance theater and alternatively face 2nd Street at ground level with space in both for events.
The entire complex is located across from the existing facilities on a slope connecting Olive to Hill Street. Break ground is slated to begin next year, with an anticipated completion date set for the fall of 2025.