The new Gran Canaria Stadium, designed by L35 Architects in collaboration with Estudio 0710 under the "La Nube" proposal, seeks to transform the venue into an architectural and sustainable landmark, ready to host international events and meet FIFA standards for the 2030 World Cup.

The project includes expanding the capacity from 32,418 to 44,020 spectators, moving the North and South stands closer to the pitch to improve visibility and atmosphere, and a phased construction that includes the renovation of access points, interior areas, and exterior design to optimize circulation and integrate the stadium into its urban environment.

One of the most notable aspects of "The Cloud", designed by L35 Architects with Estudio 0710, is its holistic approach to sustainability, which is present throughout the project. The stadium's envelope will incorporate innovative materials that optimize natural light and ventilation, reducing energy consumption, while the interior will implement a traditional humidity collection system (mist catcher), used for the first time in a building of its kind. Furthermore, the roof will integrate solar panels and rainwater harvesting systems to increase efficiency and reduce the carbon footprint.

La Nube, Estadio de Gran Canaria por L35 Architects y Estudio 0710. Visualización por L35 Architects.

The Cloud, Gran Canaria Stadium by L35 Architects and Estudio 0710. Rendering by L35 Architects. 

The design of the Gran Canaria Stadium roof is based on a spoked wheel with an outer compression ring supported by 44 pillars and two inner tension rings, achieving a lightweight and strong structure. The rigid supports and vertical bands between the spokes ensure the triangular geometry and provide visual dynamism, while membranes and arches facilitate water collection. Beyond football, the stadium is designed as a multifunctional and social space, capable of hosting events, conferences, and cultural activities, with new uses to foster innovation in sports and entertainment, as well as a renewed commercial and restaurant offering connected to Fondos de Segura Street.

“Our goal is to create a stadium that is not only an architectural icon but also serves the community’s needs and meets the challenges of climate change. We want ‘The Cloud’ to become a symbol of sustainability and modernity.”

Alejandro Lorca, Senior Partner at L35.

The Cloud, Gran Canaria Stadium by L35 Architects and Estudio 0710. Rendering by L35 Architects.

The Cloud, Gran Canaria Stadium by L35 Architects and Estudio 0710. Rendering by L35 Architects.

Project Details

Projected capacity: 44,020 spectators.
Primary materials: Textile membrane, concrete and local Stone
Sustainable systems: Humidity‐harvesting system (locally known as captabrumas), solar panels, rainwater collection
Additional uses: Dining facilities; conference and events spaces; sports innovation hub; sports and entertainment venues
With “The Cloud,” Estadio de Gran Canaria rises as a global icon, blending innovation, functionality, and sustainability into one ambitious, visionary architectural project.

More information

Label
Architects
Text

L35 Architects. Lead architect.- Alejandro Lorca. Project leader.- Guillermo Gusó.
Estudio 0710. Project leader.- Eduardo Pérez Gómez.

+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Project team
Text

L35 Architects.- Diego Blasco, Hugo Martín, Raquel Perez, Marta Dominguez, Diego Fierro, Carlota Martín, Iván Lopez-Chicheri, Roberto Raez. 
Estudio 0710.- Hugo Martínez, Alberto Díaz.

+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Collaborators
Text

Project Management.- Proyecta XXI Project Management.
Facade and Roof Engineering.- Schlaich Bergermann Partner.
Structural Engineering.- INES Consulting Engineers.
Facilities Engineering (MEP).- Urculo Consulting Engineers S.A.
Landscaping.- Spacecoop.
Consultants.- SPSG Consulting.
Collaborators.- Equipo .exe, CGMH Arquitectos.
Geotechnics.- Labetec Engineering.
Demolition.- IM15 Engineers.

+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Client
Text

Insular Sports Institute of Gran Canaria.

+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Area
Text

Gross floor area after renovation: 98,000 m².
Spectator capacity: 44,020.

+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Dates
Text

Results announcement: February 7, 2025.
Start year: 2025.
End date: June 30, 2029.

+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Location
Text

C/ Fondos de Segura. 35019 Las Palmas de Gran Canaria, Las Palmas, Spain.

+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Rendering / Video
Text

L35 Architects.

+ + copy Created with Sketch.
- + copy Created with Sketch.

L35 Architects is an architecture, urban planning, and design studio with offices in Barcelona, ​​Madrid, Paris, Milan, Sotogrande, Miami, Mexico City, Bogotá, Santiago, Istanbul, and Abu Dhabi. Comprised of 25 partners and more than 200 professionals, since its founding in 1967 by architects José Luis Martínez Honrubia (1945), Juan Fernando de Mendoza (1944), and José Ignacio Galán (1944), —with Guillermo Murtra also initially participating—the studio's history has specialized in residential, office, hotel, commercial, stadium, mixed-use, and urban development.

Its experience in large-scale projects and complex mixed-use programs is particularly relevant. It is currently working on the remodeling of the Santiago Bernabéu Stadium in Madrid, the El Campín cultural and sports complex in Bogotá, the Bolívar Stadium in La Paz, the redevelopment of the Toulon waterfront in France, and the renovation of the Stazione Roma Termini. With projects in 40 countries, L35 Architects approaches any architectural challenge through collective reflection with its clients and collaborators, pursuing design excellence. The studio's name comes from its original location at 35 Plaza Letamendi in Barcelona, ​​and throughout its history, it has worked on more than 200 international projects.

Read more

llps arquitectos (Estudio 0710) is an architecture study composed of the partners Eduardo Pérez Gómez and Miguel Ángel Sánchez García. Miguel Ángel Sánchez García is an architect from the Architecture Polytechnic of Madrid. Eduardo Pérez Gómez is an Architect from the Architecture Polytechnic of Madrid and a Design Associate Professor.

They have been guest professors and have imparted conferences at the Universities of Harvard (EEUU), the Polytechnic of Milan (Italy), the University of Nairobi (Kenya) and the University of Addis Abeba (Ethiopia) and others on a Spanish national level. Their work has been awarded eleven first prizes, among those; four on an international level stand out: the Multi-Purpose Palace of Gran Canary, the Psychology Faculty of Malaga, and recently the Intermodal Railway and Buses Complex, as well as the International Exhibition of the Spanish Pavilion in the Venice Biennial of Architecture in 2000.

They have developed works in different areas and programs, it should be pointed out: the Spots and Multi-Purpose Palace of Gran Canary, the Third-Commercial Hybrid Complex in Madrid, the Social Centre of Almoguea, a Block of social, private and single-family flats on a national level, as well as third and industrial Complex in developing areas. Their work has been displayed in many countries such as EEUU, Canada, Brazil, Chile, Turkey, Sweden, Belgium, Italy and France.

Read more
Published on: October 23, 2025
Cite:
metalocus, SARA GENT, CAMILA DOYLET
"Expansion and renovation Gran Canaria Stadium, The Cloud by L35 Architects and Estudio 0710" METALOCUS. Accessed
<https://www.metalocus.es/en/news/expansion-and-renovation-gran-canaria-stadium-cloud-l35-architects-and-estudio-0710> ISSN 1139-6415
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...